Hacker News new | ask | show | jobs
by dzdt 28 days ago
The forensic report on the failure of the cable sockets is at https://www.thorntontomasetti.com/sites/default/files/2022-0.... Unlike the linked article this includes detailed diagrams and discussion explaining how these sockets worked and how they failed.

My attempt at a quick summary: the Arecibo instruments were held up by heavy steel cables, which are composed of a bundle of 126 to 216 individual wire strands twisted together, where each wire strand is about 1/4 inch diameter. At the cable ends these were anchored in sockets. The socket is conical, widening out towards where the wire ends go. The wire strands of the cable would be separated in a "broom" shape to fill out that conical area, and then the whole thing filled in with molten zinc.

The failure mode of these zinc-filled sockets is for an inner core cylinder, about the same diameter as the cable body, to pull out from the socket while outer strands of the cable which are broomed out of that core either snap or pull free from the zinc plug.

This failure mode hadn't really been seen prior to the Arecibo collapse, partly because it is a long term process where the zinc slowly flows under stress over decades.

4 comments

I think the "electromigration" part of this is a red herring. It seems perfectly plausible after reading this report that improper construction and low safety factors were the cause of the collapse.
Given the choice between "you should've gone up a size" and "you should've bought more engineering" these reports will always say the latter because they are prepared by engineers.
Although there is a third option that's preferable and somewhat what is recommended by the report.

Once failure is identified, it should be understood before deciding if you can delay remediation.

It seems once failing sockets were found they were considered to be random failures and not systematic failures that would accelerate.

I'd summarize it this way:

With competent engineering and construction, the (failed at Arecibo) zinc socket cable anchors can be very reliable. Unfortunately, Arecibo's engineering was so-so, and the construction quality was half-assed.

With annual inspections (by someone with a passable understanding of cable anchors) the problems at Arecibo could easily have been caught in time to correct. Unfortunately, Arecibo received no such inspections.

And this is roughly the pattern for most "sudden" failures of infrastructure.

> Unfortunately, Arecibo received no such inspections.

With or without the inspections, the problems Arecibo faced were of a more serious nature. They are hinted in one of the findings: the non-replacement, repair or bypass of the sockets where large slips were observed.

The telescope received minimal funding for maintenance over the two decades prior to the collapse despite signs of increasing damage observed in the various inspections. A lot of factors probably contributed to this (political climate, the dropping importance of Arecibo compared to other science instruments and missions, and so on) but the result was that the structure was left with slow but sure decay.

I met a couple of people who worked with the telescope including on location and they told me that the general feeling among the people who had this on their minds (most people who ever had anything to do with Arecibo cared about the science not the instrument) was that the decay was slow but certain and catastrophic failure was bound to happen sooner or later. Like a car receiving no maintenance despite the check engine light being on for a decade.

The telescope received minimal funding because stakeholders couldn't make a good case for more. The results the facility could produce weren't seen as justifying the expense. In that light, that it was operated at all was more than one might reasonably have expected. The alternative was to just shut it down earlier. They squeezed the last drops of output before the old thing was allowed to die.

Sometimes with facilities like this you have to make the call that it's over.

Budgets are limited and there was cooler science to do in space and the newer more modern (and in one case even larger) ground-based ones.
Yes-ish? Funding was far more plentiful when the telescope was being designed and built, and in its early decades. I know zero details about that era - but I strongly suspect it suffered from "just focus on the cool parts" syndrome. And if it'd been designed and built correctly, or the problem caught and corrected back then, it would very likely still be standing.

Which is not to say it'd still be receiving operational funding, nor that its potential scientific contributions would be particularly worthwhile.

It was built in the ‘60s and started losing its relevance and funding in the 2-3 decades before the collapse. A lot of time for issues to develop, be noticed, but not have enough money to fix.
Read through the Thornton Thomasetti Forensic Report (linked above).

If the original builders had cared about the boring parts, then pre-WWII QC technology could easily have spotted the extremely shoddy workmanship in the zinc spelter sockets, while those were originally being fabricated.

Similar for designing larger safety margins into the whole cable system. Even PHB's can understand that "Hurricane Snaps Cables, Telescope Collapses" headlines could make them look really bad.

Ah, so historically things were build with a lot of slop. It was just the traditional kind with sloppy design, sloppy construction, and sloppy maintenance.

There is a lesson here to be ignored in the name of short-term personal gain.

The pictures on page 25 seem to show how this socket design fails. First because they didn't evenly distribute the wires in the socket (seriously??)... And second, the shear on the zinc from the compressed wire bundle is essentially a narrow rectangle in the direction of the cable with almost all the force concentrated in a narrow forward bit, not really distributed evenly through the socket, because of the wire ends splaying outward and not being equally distributed. I guess the idea is the rest of the zinc towards the back provides a counter force on the front part, but there's a whole lot more zinc in the back pulling on a smaller amount in the front. The tight bundle and the conical shape is great for a tight install, but doesn't help distribution of load. Compare to the Golden Gate Bridge wire termination (https://c7.alamy.com/comp/2RY9PKW/golden-gate-bridge-plans-i...). The zinc creep is definitely bad, but it seems made worse by an uneven distribution of load in the socket, in addition to all the other problems...

tl;dr once the outer wires break in the socket (in part due to zinc creep, but also potentially more load on them), the "glue" keeping the wire bundle connected to the socket is broken, the former wedge keeping the core in place becomes a straight line, and you have a core ready to pop out.

AFAIK cable brooming for spelter sockets is still not automated and relies on human skill, there's no tool to guarantee the necessary wire distribution. I wonder why it's hard to automate, these sockets are everywhere (along with wedge sockets) and are always safety-critical.
Thanks for the quick summary