Hacker News new | ask | show | jobs
by Symbiote 26 days ago
If someone in Alberta discussed a meeting with someone in Britain "let's say 12:00 London time" and the Albertan recorded that as 05:00 in their own calendar, then how can the software know that this should now be 06:00?

The Albertan could have set the time to 12:00 in Europe/London, but probably few people do this unless they're expecting to travel to the other place.

2 comments

it seems an unsolvable problem either way, the meeting is "at 12:00 london"

1. the London person owns it, schedules in local (London) time 12:00

2. the London person owns it, schedules mental math explicit Alberta time 05:00

3. the Alberta person owns it, schedules in local (Alberta) mental math time 05:00

4. the Alberta person owns it, schedules in explicit London time 12:00

You cannot get all of these working by software only no matter what you do, because there "mental math" time cannot take into account the implicit expectations, 1 and 4 will be correct as stated (the meeting is at 12 London time) but 2 and 3 what do you do? How would you differentiate between "mental math what I thought Alberta time was" vs "I really meant it at this Alberta time"

The problem you are describing is solved by saving/persisting times in UTC. The calendar will display the event by using the user's current timezone and the UTC time to determine local time.
You can store times in UTC if you want, but that alone doesn't solve the problem. A UTC timestamp alone is not enough information about an event.

Consider a Doctor's appointment for Dec 20, 2026 2pm in Calgary. Regardless of whether its booked a year ahead (ie before the new time zone rules were decided) or a week ahead (after the rules were decided, and consequently a different UTC time), the expectation is that it will be at at 2pm local time.

Generally speaking, UTC + localization works for past events, but not future ones (see sibling comments)
But doing that breaks the opposite (and more common) problem: all the meetings in Alberta, planned before the change to the time zone was announced, will have the wrong hour.