Hacker News new | ask | show | jobs
by otabdeveloper4 2 days ago
A Lean program is not a proof.
2 comments

If you believe the verification is invalid and are able to come up with some objective metric for it, I'd be willing to take the other side of a bet.
I doesn't matter what I believe.

A Lean program is not a proof until Lean, , the C sources it generates, the C compiler and the CPU and hardware platform are all formally verified. (They aren't and will never be.)

This is a neat engineering trick but it's not math.

P.S. Before you accuse me of excessive pedantry: the Riemann hypothesis has already been demonstrated to be true before the adevent of AI, numerically. Excessive pedantry is the entire point of this math problem.

This contradicts your previous statement above